Company Introduction

A. Project management team including TFM

B. Ducting fabrication support and equipment manufacturing for air purification system.

C. Strategic alliances

This 4 areas of focused in mega project planning as very important as this will create impact on the operation cost and social image for the company. As such, Yorkool started this lead in this alliances to ensure the right direction is carried out accordingly with the followings professionalism
¢Ù Certifications and consultancy in cleanroom and pharmaceutical (GMP and FDA requirements)
¢Ú Energy audit and solution
¢Û Energy conservation proposal
¢Ü Financial model

Well equipped repair & calibration Cleanroom facility


1

During the feasibility study, it is important to ensure that all the followings is complied;
¢Ù EHS
¢Ú Operating specifications and certification requirements.
¢Û Government policy

2

To do a proper and detail study the application of actual power and energy utilization. The system must also considered and walk in line with the future Government policy.

3

A good and comprehensive energy conservation proposal should includes the followings;

¡Ì¡¡No wastage on the required loading
¡Ì¡¡Energy recovery
¡Ì¡¡Costs savings in installation, operation and maintenance.
¡Ì¡¡Utilized the cost advantage in the Government policy and power concession rate at different timing.

4

Financial plan to assist user to obtain a comprehensive system within their budgetary as the repayment is from the future operating cost savings