Company Introduction

A. Project management team including TFM


Scope of work involved;
¢Ù Site investigation
¢Ú Design and proposal
¢Û Site supervision / Quality / Schedule / EHS control.
¢Ü Procurement and logistic control.
¢Ý Testing & commissioning
¢Þ Maintenance work and after-sale service;

We will appoint a trained technician to stay on site upon project completion. This is to ensure that the system is operating as per requirement without fails,,,,and at the same time to train up the maintenance from the owner side.

Remarks: We are strongly supported by our parent companies in Singapore in the design work and project management if requirements.



B. Ducting fabrication support and equipment manufacturing for air purification system.


Factory area: 29,000m2
Production capacity;
Rectangular ducting @ 90,000 m2 /mth
Spiral ducts @ 300,000 m /mth
Accessories @ 400,000 pcs/mth


B1. Ducting fabrication support.

Scope of work involved;
Ducting fabrication factory in Suzhou
Most than 90% of the equipment are all imported.
We do Teflon coating for chemical ducting.

Remarks:
The reasons to have direct control in this area is because
a. The area required for ducting fabrication on site is very big and is normally not practical due to space limitation
b. The inspection on workmanship and materials need to be done during the fabrication process.
c.  Better logistic and schedule control.
d.  Any changes on site, the workshop will amend accordingly to minimized the damage.


  • Laser processing

  • Crimping machine

  • Plasma cutting

  • Bending machine

  • Laser processing

  • Punching shear

  • Straight seam welding

  • Auto welder for SUS ducts

  • Auto-line for spiral ducts

  • Coating drying room


B2. Equipment manufacturing for air purification system.


Factory in Dalian

Factory in Dalian

This technology is essential for certain manufacturing as;

¢Ù To ensure a good and safe working environment.
¢Ú To ensure that there is no pollution to the surroundings
¢Û To enhance the quality of the product.

The objective of direct control in equipment manufacturing for air purification system is because we need to have a full understanding of the production process and the chemical application. This is very different between the industry and individual application between the manufacturing plant. Most of the system need to be custom build and tied in with the M&E works especially the air-conditioning system. Furthermore, the application process might be under classified for certain industry.

  • Before

  • After

Our scope involvement in air purification system includes;
¢Ù Oil mist
¢Ú Welding station (Smoke)
¢Û VOC (RTO system)

Below show our plant in Dalian and the range of products;


Products:


  • Silencer


  • Manual pulse single/double station


  • Mechanical oil mist purifier


  • High-temperature airtight valve


  • Vertical integration


  • High-temperature valve


  • High-temperature valve


  • Electrostatic oil mist purifier


  • High-temperature airtight valve


  • Transverse split type

  • Turret punch press

  • Laser cutting machine

  • CNC Bending machine

  • Four roller Bending machine

  • Pliers Riveting Welder



C. Strategic alliances

This 4 areas of focused in mega project planning as very important as this will create impact on the operation cost and social image for the company. As such, Yorkool started this lead in this alliances to ensure the right direction is carried out accordingly with the followings professionalism
¢Ù Certifications and consultancy in cleanroom and pharmaceutical (GMP and FDA requirements)
¢Ú Energy audit and solution
¢Û Energy conservation proposal
¢Ü Financial model

Well equipped repair & calibration Cleanroom facility



1

During the feasibility study, it is important to ensure that all the followings is complied;
¢Ù EHS
¢Ú Operating specifications and certification requirements.
¢Û Government policy

2

To do a proper and detail study the application of actual power and energy utilization. The system must also considered and walk in line with the future Government policy.

3

A good and comprehensive energy conservation proposal should includes the followings;

¡Ì¡¡No wastage on the required loading
¡Ì¡¡Energy recovery
¡Ì¡¡Costs savings in installation, operation and maintenance.
¡Ì¡¡Utilized the cost advantage in the Government policy and  power concession rate at different timing.

4

Financial plan to assist user to obtain a comprehensive system within their budgetary as the repayment is from the future operating cost savings